63 lines
2.7 KiB
Markdown
63 lines
2.7 KiB
Markdown
# KOFORIDUA - Comments
|
||
|
||
## Portal
|
||
|
||
Add what happens after 30 days to the feedback, feedback during the process. These are to be Yes and No questions.
|
||
Remove building permit from the types of permit.
|
||
Who can apply ? Add categories to describe the sections below. Also, check the details listed there and align them.
|
||
Add certification of habitation to the FAQ. You need it to inhabit your development.
|
||
Add do I need a land use certificate.
|
||
Add links to the various section of the menu.
|
||
Add assembly contact to the district assemblies.
|
||
Planning permission definition to be on the landing page.
|
||
Add a number input box for adding more groups to the already numbered text.
|
||
Add disclaimer in indicate that the user is responsible for all data being accurate in the system.
|
||
Add document type to each upload.
|
||
Edit the applications received part after submit. Add comments to instruct the applicants that they have to upload their required documents and pay before application is actually received.
|
||
Summary receipt of the application form.
|
||
Upload documents should be clear (pdfs).
|
||
Max document size should also be clear.
|
||
|
||
|
||
|
||
|
||
|
||
|
||
## District
|
||
|
||
- District input box not working. `fixed`
|
||
- Add additional user positions to the positions. GIS, Plan preparation, standards and compliance, research, - `done` used the document we created in tamale
|
||
- Notifications on new permits coming in. `partial`
|
||
- There should be approval in principle. This comes before the permit. `done`
|
||
- Applicant to review should come before the application is received. `done`
|
||
- Also, add application accepted after the received. `done`
|
||
- First feedback should come after 7 days, then 14 days TSC to review. `partial`
|
||
- Get the boundaries of the site. `not started`
|
||
|
||
|
||
|
||
|
||
Parcel
|
||
|
||
Parcels should come in blocks. Currently, they come as individual structures.
|
||
We need guidelines for the parcel generations.
|
||
All parcels autogenerated roads all around them. This should be looked at.
|
||
Add shape file and iml to the exports.
|
||
Import data in from different formats.
|
||
|
||
|
||
|
||
|
||
Drawing Tools
|
||
|
||
Add a feature to be able to delete individual layers after the data has been collected.
|
||
Unable to roll the collapsible overlay tools.
|
||
Add a location detector to be able to pick current location of the user.
|
||
Mapping movements should also be added.
|
||
Add a report feature to the analysis on the drawing tools.
|
||
A feature to draw a buffer radius based on the user input.
|
||
When a layer is imported, it should be zoomed to that layer.
|
||
Add place holders to the map and a feature to delete specific placeholder without deleting all placeholders.
|
||
Add geo processing tools or features like dissolve and merge.
|
||
Create manuals and also video recordings of the help sections and how to use the system.
|
||
Imported data throws the location of the data to a different location. |